New Sanctuary Speakers
During the week of January 23rd the sanctuary speakers will be replaced and upgraded. The existing speakers which date to the 1986 church refurbishment, will be replaced with new speakers mounted in the same approximate location. The new speakers incorporate a design that can send more sound toward the back of the sanctuary than to the front of the sanctuary. Also two new speakers will be added of similar design that will fill in sound in the area around the altar which has been a dead zone.
During the week of January 23, scaffolding will be assembled near the speakers, the workers will cease work for daily mass which will be held as usual.
Sanctuary Renovation
On Wednesday, January 11th, the sanctuary renovation committee, including Fr Sal, held a meeting with our new architect, Jim Vernon, of the Architectural Partners of Lynchburg, VA. Our previous architect, Joe DeVylder of O’Brien and Keane of Arlington, VA developed a renovation concept and then suggested we utilize a local architect to prepare the final design and construction drawings.
Jim has offered the committee many variations using computer generated photo realistic renditions of the renovation with a variety of design variations, colors, trims, etc. The committee spent considerable time reviewing the options and was able to agree on a number of desired features. Much progress was made.
Jim will take the design decisions and create new renditions for the committee’s review in a meeting scheduled for January 25th at 1 pm in the commons. All are welcome to this meeting.
The next step is to complete the design and prepare with Master Engineers a bid package to be submitted to local contractors. The plan is to start construction in early summer of 2023.